19 Oct
Dutch Foundations
Abu Dhabi
**1. Position Objectives**
Ensure Project Quality Plan is implemented and monitored on project sites and is consistent with client requirements and to national and international standards.
**2. Key Roles & Responsibilities**
- Study project specifications in detail for the complete and required scope, materials, work execution, tests, etc.
- Review all approved documents such as method statements, Project Quality Plan, drawings, prior to the commencement of works on site
- Monitor site activities according to Project Quality Plan and Inspection and Test Plan, Project Specifications and Method Statements
- Oversee communication with third-party independent testing companies
- Attend concrete trial mixes at RMC Batching plant upon design mix approval and witness all tests that are carried out on fresh concrete
- Advise RMC supplier/approved third party testing Laboratory for the sampling of test specimens as per project requirements
- Submit preliminary trial mix report to consultant in coordination with Document Controller
- Witness 7 days and 28 days testing with consultant for the trial mix conducted
- Ensure submission of all compressive strength and durability test results for the trial mix conducted
- Report all Quality issues to the QA/QC Manager
- Submit daily site reports for all daily works executed, on the next day before 09:00am; daily report shall include all tasks carried out, materials received on the site etc.
- Highlight obstructions encountered on the project, such as utilities, failure of dewatering system etc. as well as equipment/manpower idle hours (if any) working on the site
- Ensure construction materials such as reinforcement steel, spacers, tie wire, cement etc.
are well protected
- Carry out inspections for each activity and record in the inspection checklist
- Issue work inspections one day in advance and obtain approval within 5 days of completion of the activity; forward copy of Work Inspections to respective Document Controller
- Submit installation records for any activity within 24hrs and maintain signed records
- Ensure that all approved documents, records are available in both hard and soft copies
- Follow a well-maintained filing system on the sites
- Issue site observation report for any minor nonconformances by execution team/subcontractor/supplier
- Issue internal nonconformance report for major nonconformance; ensure close out within agreed time frame; send report to Quality Department for record
- Close out external NCRs received from client without delay
- Ensure that well organized concrete check points are available on site
- Ensure sampling of materials (concrete/reinforcement) is carried out in accordance with project specifications or as agreed with Engineer
- Follow up on test results in coordination with HO and submit on time
- Ensure that all equipment's /tools are calibrated, and valid calibration certificates are available on site
- Prepare and submit Monthly Quality Reports to QA/QC Manager on 3rd day of every month
- Monitor concrete and Reinforcement consumption on daily basis and report to QA/QC Manager
- Ensure project handing over documents/records are submitted in accordance with project specifications
- Ensure all Quality documents/records are handed over to HO after project completion
- Ensure that fresh concrete specimens are covered with polythene sheet to prevent evaporation of water content in the concrete samples
- Demould samples after 24hrs. of casting and arrange transportation of samples to laboratory for curing
- Any other duties assigned by QA/QC Manager
**3. Experience / Education / Training**
- Bachelor’s Degree in Quality or Engineering or equivalent
- 5+ years’ work experience in Quality Management
- Previous experience in Ground Engineering preferred
- Driver’s License
Pay: AED6,000.00 - AED8,000.00 per month
Application Deadline: 30/08/2024
▶️ QA/qc Officer Construction
🖊️ Dutch Foundations
📍 Abu Dhabi